Falun Copper Mine — Monument
Falun Copper Mine is a monument (great project) in Europa Universalis IV, located in Dalaskogen.
Falun Copper Mine
MonumentStarts at tier 1
Falun Copper Mine is a great project located in Dalaskogen. Create it in its province from the console with the great_project command.
Tier 1 bonuses
Upgrade cost: 1000 ducats · Upgrade time: 120 months
| Trade Goods Size | +3 |
| Local Build Cost | -5% |
| Local Build Time | -5% |
Tier 2 bonuses
Upgrade cost: 2500 ducats · Upgrade time: 240 months
| Trade Goods Size | +6 |
| Local Build Cost | -10% |
| Local Build Time | -10% |
| Artillery Cost | -10% |
Tier 3 bonuses
Upgrade cost: 5000 ducats · Upgrade time: 480 months
| Trade Goods Size | +9 |
| Local Build Cost | -20% |
| Local Build Time | -20% |
| Artillery Cost | -20% |